Two old buildings on the Maple Street site, built in 1916 and 1948, were demolished in 2012, and construction began on the new 2-story, 78,000 GSF classroom building.
The L-shaped brick building includes 20 classrooms, a cafeteria, library, gymnasium, and an elevator.
- Architect: JCJ Architecture
- Construction cost: 26 million USD
- Completion date: 2014