Glover Elementary School (Marblehead, MA)
Glover Elementary School
Two old buildings on the Maple Street site, built in 1916 and 1948, were demolished in 2012, and construction began on the new 2-story, 78,000 GSF classroom building.

The L-shaped brick building includes 20 classrooms, a cafeteria, library, gymnasium, and an elevator.

  • Architect: JCJ Architecture
  • Construction cost: 26 million USD
  • Completion date: 2014
Thompson Elementary School (Arlington, MA)
The new 3-story, steel-framed 60,000 GSF school building replaced the existing building from the 1950's.

  • Architect: HMFH Architects
  • Construction cost: 16 million USD
  • Completion date: 2014
Southbridge Middle School and High School (Southbridge, MA)
Southbridge Middle School and High School
A new construction of 200,00 GSF of classroom building

  • Architect: Tappe Associates
  • Construction cost: 40 million USD
  • Completion date: 2013
JFK Middle School (Hudson, MA)
A new construction of 122,00 GSF of classroom building

  • Architect: OMR Architects
  • Construction cost: 36 million USD
  • Completion date: 2012
Boston Renaissance Charter School
Boston renaissance Charter School
The project included structural renovations of a 19th century 4-story, 70,000 GSF masonry/timber mill building, along with an ajacent 20,000 GSF warehouse.

A new addition of about 15,000 GSF was contructed to span the buildings into one continuous structure.


  • Architect: HMFH Architects
  • Construction cost: 25 million USD
  • Completion date: 2010
Mugar Performing Arts Center, The Cambridge School (Weston, MA)
The 16,000 GSF Community Center provides services and meeting space under a complex arrangement of exposed wood trusses with custom engineered connections, coordinated with the architect for both function and aesthetics.


  • Architect: Leers Weinzapfel Associates Inc.
  • Construction cost: 4 million USD
  • Completion date: 2000
Roberts Hall of Science and Mathematics Building, Culver Academies
Roberts Hall of Science and Mathematics
The Roberts Hall of Science and Dicke Hall of Mathematics is a three story 64,000 square foot facility housing classrooms and offices for both the science and math departments at Culver Academies.


  • Architect: A.D.G.
  • Construction cost: 12 million USD
  • Completion date: 2001
Groton School Student Athletic and Recreation Center (Groton, MA)
The Student Recreation and Athletic Center at the Groton School comprises 150,000 square feet of new and renovated space and includes an ice rink, a swimming pool, squash courts, a fitness center, locker rooms, and a gymnasium with elevated running track.


  • Architect: Perkins & Will
  • Construction cost: 16 million USD
  • Completion date: 1998