VAMC West Haven - CHP facility
Veterans Affairs Medical Center, West Haven, CT
At the VAMC West Haven campus, a new Combined Heat and Power (Cogeneration) plant was built to produce the facility's base level of electricity, with waste heat used to supply the boiler and chiller plants.

  • Completion date: 2017
  • Construction cost: 15 million USD
  • Architect: CannonDesign
Veterans Affairs Medical Center, Boston, MA
Structural renovations and modifications were made to the VAMC building 1-E Wing, to accomodate the installation of a new chilled water plant onto the roof.

  • Completion date: 2013
  • Construction cost: 9 million USD
  • Architect: Payette
Veterans Affairs Medical Center, Providence, RI
Veterans Affairs Medical Center
A new 16,000 SF addition was constructed on the A-Wing of the main building. On the B-Wing, structural renovations were made to accomodate heavy MRI equipment.

  • Completion date: 2009
  • Construction cost: 5.9 million USD
  • Architect: Payette
VMAC Specialty Ambulatory Clinic Addition
A third story addition of 14,300 sf to the main building of the VA Medical center in Manchester, NH.

  • Completion date: 2009
  • Construction cost: 3.9 million USD
  • Architect: Payette
Veterans Affairs Medical Center - new research building
Veterans Affairs Medical Center, West Haven, CT
A new 8,000 sf addition to the Neuroscience research building at the VA medical center in West Haven, CT.

  • Completion date: 2008
  • Construction cost: 2.8 million USD
  • Architect: Payette
Wing Memorial Hospital
A 107,500 GSF addition to the Baystate Wing Memorial hospital in Palmer, MA.

  • Completion date: 2008
  • Construction cost: USD
  • Architect: Payette